Based in Santiago, covering the whole archipelago. Our team travels for the study, the installation and the maintenance.
Our base. All 8 projects delivered to date are on this island, from Palmarejo to Tarrafal.
Study, installation and maintenance, with our team travelling to you.
Solutions for hospitality, retail and residential.
Grid-connected, hybrid and off-grid systems.
Maio, São Nicolau and Brava included: coverage across the whole archipelago.
Rua Santo Antão 11, Palmarejo, Praia · +238 952 3978 · contacto@gratiluz.cv · Mon–Fri, 8am–6pm
Free study: we analyse your consumption and tell you how much you could save, with no obligation.
5 real projects in Cape Verde, with figures, technical specifications and video.
Drinking water extraction from boreholes and wells, powered 100% by solar.
WhatsApp or a call, Mon–Fri, 8am–6pm. A reply within 24 hours.